午夜不卡AV免费,午夜福利理论片在线观看,免费A级毛片在线播放不收费 ,无码AV天堂亚洲内射夫妻

Thanks to modified techniques, bridge over Huayang River got its mega bored pile foundation completed
ACEG Road and Bridge Engineering Company Limited  |  Updated: 2021-03-04  |  Views: 12953
As the Chinese proverb goes, the spring comes earlier for those who are diligent. At 16:49 on February 26th, 2021, the concrete casting work for the last bored pile of the main bridge over Huayang River in Anhui province, China, has finished as scheduled, which marked the time came for ACEG Road and Bridge Engineering Company Limited, the contractor of the bridge project, to get ready for the construction phase of the superstructures of the bridge in an all-round way.
 
 
According to the design, bored cast-in-place piles with a diameter of 2.5 meters were adopted for the underwater foundation of the main piers of Huayang River Bridge; each pier has three piles in two rows and the designed depth of the piles range from 63 meters to 64.5 meters and the boreholes were drilled in method of reversed circulation pumping suction and the vertical piping casting method was used to pour the concrete into boreholes.
 
 
The company’s 2.5m diameter borehole and concrete filling techniques have successfully overcome the problems for the project under the complex geological conditions, as large diameter pile drilled with a small drill, shaft wall protection by drilling mud, drilling in an iron grit layer and nuisanceless disposal of the drilling mud, which have the advantages of fast speed, high efficiency and high qualities.
 
 
The average distance between the main bridge under construction over Huayang River and the old bridge in operation is less than 0.5m and the pile foundation is located inside the riverbed in poor geological conditions of complex stratums and the construction spaces were limited. Since the commencement of the project in 2019, under the strong supports of the administrative departments at all levels and the technical guidances of several well-known experts of the company and the industry, the new Huayang River Bridge has undergone several design adjustments and optimization, that have resulted in the improvement of the navigable level of Huayang River, better operation safety of the old bridge and less construction investment costs.
 
The satisfactory completion of the concrete pouring of the main bridge piles provides a time guarantee for the completion of the bearing platform construction before the flood season in 2021 and lays a solid foundation for the completion and delivery of the bridge in the second half of the year. It also provides technical references and demonstration for similar projects in the future.
 
东北浓毛老妇国语对白| 日本丶国产丶欧美色综合| 欧VODAFONEWIFI69| 又粗又硬又黄A级毛片| 日本黄a级a片国产免费| 大sao奶涨奶头痒快来吃| 国产成人精品白浆久久69| 公交车上内裤滑进去了会怎么样| 三妻四妾免费观看完整版高清 | 人人妻人人澡人人爽欧美一区九九| 人妻少妇精品视频三区二区一区| 5566视频一区二区三区| 日本的AAA高清片| 国产精品久久久久精品三级卜| 18款禁用免费安装的软件app| 欧美另类videossexo| 雯雯在工地被灌满精在线播放| 精品国产黑色丝袜高跟鞋| 国语精彩对白在线视频| 囯产极品美女高潮无套久久久| 影音先锋女人AV鲁色资源网久久| 人妻少妇精品无码专区二区| 日韩毛片人妻久久蜜桃传媒| 普通话做受对白xxxxx在线| 久久精品国产亚洲7777| 久久久久亚洲AV成人片| 无遮挡粉嫩小泬久久久久久久| 亚洲国产精品自在自线观看| 小舞屈辱打开双腿自慰出白浆| 365天今时之欲| 国产精品乱码久久久久久小说| 黄桃AV无码免费一区二区三区| 无码人妻精品一区二区三区不卡| 全部孕妇毛片丰满孕妇孕交| 下面一进一出好爽视频| 大sao奶涨奶头痒快来吃| 无码137片内射在线影院 | 欧美性猛交XXXX黑人猛交| 99久久久无码国产精品试看| 国产免费AV片无码永久免费| 亚洲欧美自偷自拍另类小说 |